Project Summary and Scope

This project consists of the renovation of the WWTP Sludge Thickening Equipment and Facilities.  The existing sludge thickening centrifuges and ancillary pump and other equipment are at the end of their useful life and require replacement.

“Information and documents authorizing, depicting or outlining details about the project, including, but not limited to, the following:

⦁    Procurement Documents (although drawings and details about the design will be available from the Procurement office, these documents should be considered as protected by the Homeland Security exception and should not be shared unconditionally with the public.  Anyone requesting access to these documents should complete and sign a FOIA request form with DPU).  

 

 

Project Milestones

Complete Biosolids options scoping study 2nd Qtr 2017.
Begin design of improvements 2nd Qtr 2017.

Project Funding

DPU Wastewater Utility Enterprise Funds in the amount of $7,126,000.  Funds for this project were appropriated prior to Fiscal Year 2016-2017.  

Project Status Updates

Project scoping study nearing completion.  Preliminary design work for replacement of thickening centrifuges began February 2017.

Permit, information is listed below. For details please call the Department of Planning, Development and Review at 804-646-4169.

None to date

Expenses (costs are reported quarterly)

RAPIDS Project # - None to date.
Total expenditures as of 07/14/2017:  $0.00.

 

Project Contact Information, if you have questions about this project please contact this individual.

Performance Measures and Benchmarks

To be determined

Project Overall Status (Active, Pending or Complete)

Active