Hull Street Road Improvements Phase I

Project Summary and Scope

Project Limits- From Hey Road to Warrwick Road

This project will enhance capacity and improve safety for motorists, pedestrians, and bicyclists by separating the thru lanes from turning lanes and by reducing the number of conflict points along the corridor.  The proposed improvements will provide a consistent 4 lane typical section (11’ wide lanes) with two lanes each direction and a 15’ wide median with left turn lanes and adequate storage length at intersections, major traffic generators and median crossovers. The improvements will include curb and gutter and a drainage system to handle stormwater runoff.  A 5’ wide green space and 5’ wide sidewalk along the east side and an 8’ wide green space and 10’ wide shared-use-path along the west bound side will provide pedestrian and bicycle safety and route continuity along the entire corridor and connectivity with the City’s bicycle and pedestrian Master Plan. 

The Hull Street Road Improvement project, located along the dividing line between the Midlothian and Broad Rock Planning Districts is included on the City of Richmond’s Capital Improvement Plan.  Hull Street Road is a mixed use Residential and Commercial corridor located on the City’s southwest corporate limits and is a gateway entrance project from Chesterfield and Amelia Counties and a major access to VDOT’s limited access Chippenham Parkway.

 

The City, in conjunction with VDOT and Chesterfield County completed a Hull Street Road – Route 360 Revitalization Study and Plan in early 2013 recommending improvements to the roadway corridor including provisions for pedestrian and bicyclist facilities, landscaping and lighting to enhance comfort and safety.  Improvements to the City’s portion of the Revitalization Plan is anticipated to improve development and corridor use along the corridor

Part of the Project Written Studies, Reports, Presentation

For Milestones Written Studies, Reports, Presentation prepared for use of employees

Project Milestones

RW Acquisiiton-  July 2019 -June 2020

Utility relocation - June 2020 - June 2021

Final Plans - October 2020

Advertisement - March 2021

Construction Start- June 2021

Construction Completion-   Decmeber 2023

Project Funding

Project is fully federal funded Project through federal smart scale funds in an amount of $ 21,099,700 as follows:

P.E= $2,600,000

RW and utility relocation= $4,360,000

Construction = $14,139,700

Total budget= $21,099.700

Project Status Updates

Project is currently in 60 % detailed design stage 

Right of way Phase is Underway 

Permit, information is listed below. For details please call the Department of Planning, Development and Review at 804-646-4169.

TBD

Expenses (costs are reported quarterly)

$2,120,000 total

Project Contact Information, if you have questions about this project please contact this individual.

For information about the details of any project first contact the public information office for the department running the project.  For most projects the following people can help:

Performance Measures and Benchmarks

Project development is on time and within budget.

Project Overall Status (Active, Pending or Complete)

Active

Ordinance Information

ORD 2019-084 declare public necessity for RW acquisiiton

2014-012-21 Adopted Hull Street Corridor full revitalization plan

 

Contract Information

Design contract number 15000003273 with JMT (PO # 15000017295)

City state project agreement with VDOT for UPC # 15959

Click here to leave Feedback